Optimisation of Artificial Lifts using Prosper Nodal Analysis for BARBRA-1 Well in Niger Delta

Authors

  • Tega Odjugo Department of Chemical and Petroleum Engineering, Afe Babalola University, PMB 5454, Ado-Ekiti, Ekiti State
  • Yahaya Baba ABUAD
  • Aliyu Aliyu Faculty of Engineering, University of Nottingham, NG7 2RD, United Kingdom.
  • Ndubuisi Okereke Department of Petroleum Engineering Federal University of Technology, Owerri- Nigeria
  • Lekan Oloyede Department of Mechanical and Mechatronics Engineering, Afe Babalola University, Ado-Ekiti, Nigeria
  • Olabisi Onifade Department of Electrical and Computer Engineering, Afe Babalola University, Ado-Ekiti, Nigeria

Keywords:

Production optimisation, nodal analysis, prosper simulator, Barbra well

Abstract

Hydrocarbon exploration basically requires effective drilling and efficient overpowering of frictional and viscosity forces. Normally, frictional power losses occur in deep well systems and it is essential to analyse each component of any well system to determine where exactly pressure is lost, and this can be done using Nodal Analysis. In this study, nodal analysis has been carried out with the use of PROSPER, a software for well performance, design and optimisation. Artificial lifts can then be used to solve the problem of frictional power losses. To increase the production of Barbra 1 well in the Niger Delta and hence extend its functional life, we have applied nodal analysis. Modelling results for three artificial lift methods; continuous gas lift, intermittent gas lift and electrical submersible pump were found to be 1734.93 bbl/day, 451.50 bbl/day and 2869 bbl/day respectively. The output from the well performance without artificial lift was 1370.99 bbl/day by applying Darcy’s model. Meanwhile, the output from the well without artificial lift is 89.90 bbl/day when aided with productivity index (PI) entry, the normal model for intermittent gas lift. Hence, from the comparative analysis of the results obtained from this study, it was deduced that when artificial lifts are employed, the well output increases significantly from 1370.99bbl/day to 2869 bbl/day (electrical submersible pump). This study concludes that wells such as Barbra 1 are good candidates for artificial lift, and this is evidenced by increasing productivity.

References

Ageh, E. A.; A. Adegoke and O. J. Uzoh. (2010). Using Integrated Production Modeling IPM as an Optimisation Tool for Field Development Planning and Management, pp 1-11, In 34th Annual SPE International Conference and Exhibition. Calabar, Nigeria: SPE.

Ahmed, T. (2014). Reservoir Engineering Handbook 2nd Edition, Houston, Texas: Gulf Professional Publishing. https://doi.org/10.1007/s007690000247

Beggs, H. Dales. (1991). Production Optimisation Using Nodal, 2nd Edition, OGCI and Petroskills Publications Tulsa, Oklahoma, USA.

Bieker, H. P.; O. Slupphaug, and T. A. Johansen. (2007). Real-Time Production Optimisation of Oil and Gas Production Systems : A Technology Survey. In SPE Intelligent Energy Conference and Exhibition, Amsterdam, 11–13.

Chaudhry, A. (2003). Gas Well Testing Handbook Copyright © Elsevier Inc. ISBN 978-0-7506-7705-9, https:doi.org/10.1016/B978-0-7506-7705-9.X5000-X

Clegg, J. D.; N. W. Heln and S. M. Bucaram. (1993). Recommendations and Comparisons for Selecting Artificial-Lift Methods. Journal of Petroleum Technology, 45(12): 1128-1166.

Gilbert, W. E. (1954). Flowing and Gas-lift Well Performance. In Sprlng meeting of the Pacific Coast District, Divlsion of Production, American Petroleum Institute, New York, USA, 1-32.

Guo B., L. W. (2007). Petroleum Production Engineering. A Computer-Assisted Approach (ISBN: 0750). Elsevier Science & Technology Books.

Belyadi, H.; E. Fathi and F. Belyadi (2019) Hydraulic Fracturing in Unconventional Reservoirs: Theories, Operations, and Economic Analysis, 2nd Edition, Elsevier Publishing Inc. ISBN 978-0-12-817665-8.

Ibrahim, A. T. M. (2007). Optimisation of Gas Lift System in Varg Field. Master's Thesis, Universiteteti Stavanger, Norway.

Litvak, M. and Angert, P. (2009). Field Development Optimisation Applied to Giant Oil Fields. In SPE Reservoir Simulation Symposium, Texas, USA, 2-4.

Mach J.M.; E.A. Proano and K.E. Brown. (1979) A nodal approach for applying systems analysis to the flowing and artificial oil and gas well, paper SPE 8025: 1082-1096.

Petex - Petroleum Experts. (2010). PROSPER. Retrieved December 22, 2017, from http://www.petex.com/products/?ssi=3

Petrowiki. (2015). Artificial lift. Retrieved December 27, 2017, from http://petrowiki.org/Artificial_lift

Stephenson, G.; R. Molotkov; N. D. Guzman and L. Lafferty. (2010). Real-Time Diagnostics of Gas Lift Systems Using Intelligent Agents : A Case Study. SPE Production & Operations, (February), 111–123.

Tetoros, I. E. (2015). Design of a continuous gas lift system to initiate production in a dead well. Technical University Of Crete, Greece.

Vogel, J. V. (1968). Inflow Performance Relationships for Solution-Gas Drive Wells. Journal of Petroleum Technology, 20(1), 83–92. https://doi.org/10.2118/1476-PA

Additional Files

Published

2020-10-07

Issue

Section

Articles